{"id":16,"date":"2016-03-31T10:02:57","date_gmt":"2016-03-31T10:02:57","guid":{"rendered":"http:\/\/www.iesworks.co.uk\/website\/?page_id=16"},"modified":"2021-01-13T11:11:11","modified_gmt":"2021-01-13T11:11:11","slug":"safety-in-design","status":"publish","type":"page","link":"https:\/\/iesworksltd.co.uk\/website\/services\/safety-in-design\/","title":{"rendered":"Safety in Design"},"content":{"rendered":"<p>IES provides a complete end-to-end service: from initial design through to site installation and aftercare. Every job is assigned a project manager, a fully trained engineer who acts as a single point of contact and all critical processes are carried out on site allowing a seamless, rapid service.<\/p>\n<p><strong>Safety in Design<\/strong><br \/>\nOur safe design approach begins in the conceptual and planning stages. By analysing and assessing potential faults and proposing safety requirements up-front we ensure the safety of the finished product in each of the lifecycle phases.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-644 size-full\" src=\"https:\/\/www.iesworksltd.co.uk\/website\/wp-content\/uploads\/2021\/01\/Safety-Design.jpg\" alt=\"Safety in Design\" width=\"810\" height=\"540\" srcset=\"https:\/\/iesworksltd.co.uk\/website\/wp-content\/uploads\/2021\/01\/Safety-Design.jpg 810w, https:\/\/iesworksltd.co.uk\/website\/wp-content\/uploads\/2021\/01\/Safety-Design-300x200.jpg 300w, https:\/\/iesworksltd.co.uk\/website\/wp-content\/uploads\/2021\/01\/Safety-Design-570x380.jpg 570w, https:\/\/iesworksltd.co.uk\/website\/wp-content\/uploads\/2021\/01\/Safety-Design-380x254.jpg 380w, https:\/\/iesworksltd.co.uk\/website\/wp-content\/uploads\/2021\/01\/Safety-Design-285x190.jpg 285w\" sizes=\"auto, (max-width: 810px) 100vw, 810px\" \/><\/p>\n<p>Our highly qualified and experienced engineers are trained in the development of safe designs that comply with the EU Machinery Directive 2006\/42\/EC and EN ISO13849-1. The use of the Applied Chart Risk Graph to calculate the Performance Level (PL) is also widely adopted in our methodology.<\/p>\n<p>A calculation of the PL is applied to each part of the control system &#8211; and combination of them &#8211; which performs a safety function using the following values:<\/p>\n<p>\u2022 MTTFd (Mean Time To Failure dangerous)<br \/>\n\u2022 DC (Diagnostic Coverage)<br \/>\n\u2022 CCF (Common Cause Failure)<br \/>\n\u2022 Structure (Category)<br \/>\n\u2022 Behaviour of the safety function at error conditions<br \/>\n\u2022 Safety related software<br \/>\n\u2022 Systematic errors<br \/>\n\u2022 The ability to execute a safety function under foreseeable conditions<\/p>\n<p>Once the required performance level has been established &#8211; and as well as utilising more traditional methods &#8211; we explore other higher-level systems which utilise the latest technology and can often prove to be a much safer and more cost-effective solution in the long term.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>IES provides a complete end-to-end service: from initial design through to site installation and aftercare. Every job is assigned a project manager, a fully trained engineer who acts as a single point of contact and all critical processes are carried out on site allowing a seamless, rapid service. Safety in Design Our safe design approach<\/p>\n<p class=\"more-link\"><a href=\"https:\/\/iesworksltd.co.uk\/website\/services\/safety-in-design\/\" class=\"themebutton\">Read More<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":13,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"jetpack_post_was_ever_published":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-16","page","type-page","status-publish","hentry","category-services"],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/PapGkF-g","_links":{"self":[{"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/pages\/16","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/comments?post=16"}],"version-history":[{"count":6,"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/pages\/16\/revisions"}],"predecessor-version":[{"id":645,"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/pages\/16\/revisions\/645"}],"up":[{"embeddable":true,"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/pages\/13"}],"wp:attachment":[{"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/media?parent=16"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/categories?post=16"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iesworksltd.co.uk\/website\/wp-json\/wp\/v2\/tags?post=16"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}